Billy Bishop Airport (Toronto Port Authority) – Terminal A Roof Replacement Details

Project Description

Overview

Final Roofing Solutions was proud to complete a major commercial roofing project at Billy Bishop Toronto City Airport, working directly with the Toronto Port Authority on Terminal A—a highly active, historically significant building on Toronto’s waterfront.

This project required meticulous planning, strict safety controls, and seamless coordination, with a strong focus on maintaining operations and minimizing disruption for airport staff, contractors, and the traveling public.


The Scope of Work

Terminal A required an extensive roof upgrade to improve performance, reliability, and energy efficiency. Our team safely removed aging sections of the existing roof system and installed a modern, high-performance solution designed for long-term protection.

Key work completed included:

  • Controlled removal of old roof sections

  • Installation of new high-efficiency insulation to improve thermal performance

  • Installation of a new PVC roofing membrane system

  • Detailed coordination and staging to maintain safe access and workflow across the terminal area

  • High-level safety planning due to the live environment and daily activity around the site


Safety & Coordination in a Live Airport Environment

Working at an active airport demands more than just roofing expertise—it requires precision scheduling, communication, and safety planning that leaves nothing to chance.

Because Terminal A is a high-traffic operational facility, our team implemented a structured approach focused on:

  • Restricted access work zones

  • Equipment staging and lifting coordination

  • Working around ongoing terminal operations

  • Ensuring a clean, professional, and controlled jobsite environment

The result was a smooth execution that met the airport’s expectations for both quality and operational continuity.


A High-Performance PVC Roof System Built for Efficiency

PVC roofing is one of the most reliable commercial flat roofing systems available today—especially for buildings that require long-term durability, energy savings, and minimal maintenance.

This new roof system provides Terminal A with:

  • Improved resistance to ponding water and harsh weather

  • Strong long-term protection against leaks

  • Increased efficiency through upgraded insulation

  • A clean, modern roofing solution suitable for critical infrastructure


Trusted by the Toronto Port Authority

We’re proud to be trusted by the Toronto Port Authority to deliver commercial roofing work where precision, safety, and professionalism are non-negotiable.

Projects like this reinforce what we bring to every job:
high-quality workmanship, detailed planning, and minimal disruption—even in high-demand environments like Billy Bishop Airport.